Tekirdağ Muratlı District Miniature Mosque Project (Muratlı Mosque): Started in 2019, completed in 2020. Total Size: 60 m2.
| Location | Muratlı / Tekirdağ |
|---|---|
| Total Construction Area | 60 m2 |
| Project Owner | AKPA Chemicals |
Tekirdağ Muratlı District Miniature Mosque Project (Muratlı Mosque): Started in 2019, completed in 2020. Total Size: 60 m2.
| Location | Muratlı / Tekirdağ |
|---|---|
| Total Construction Area | 60 m2 |
| Project Owner | AKPA Chemicals |